Real 350-027 exam answers
New 350-027 trainning materials
Exam Number/Code: 350-027
Questions and Answers:400 Q&As
Updated Time: 2009-09-19
Register for Exam: Prometric/Pearson VUE
Exam Name:CCIE Written: Metro Ethernet
The following are the 350-027 exam answers we get from all of the world company exams vendors include : examsoon 350-027 exam ,Testinside 350-027 braindumps, Pass4sure 350-027 practice exam , Testking 350-027 study guides, exam4sure trainning materials. after you read the following 350-027 exam demo questions and answers, you will see the high quanity of the exam
The 350-027 exam products are designed to maximize your learning productivity and focus only on the important aspects that will help you to pass your 350-027 test. We will provide you with 350-027 exam questions and verified answers, that reflect the actual exam. These questions and answers provide you with the experience of taking the 350-027 actual test. 350-027 exam guides are not just questions and answers. 350-027 questions have detailed for every answer, ensuring that you fully understand the questions and the concept behind the questions.
Free 640-802 Demo Download
Free demo for Cisco CCIE 350-027 exam (CCIE Written: Metro Ethernet). You can check out the interface, question quality and usability of our practice exams
Free Download 640-802 Exam Pdf Demo
Free Download 640-802 Exam iEngine Demo
Exam : Cisco 350-027
Title : CCIE Written: Metro Ethernet
1. The Hold-Down Timer used in Distance Vector protocols:
A. Sets the time limit of how long a router may keep a packet in its buffer, if the routing protocol is in the process of converging
B. Determines the number of seconds a router will wait before sending another update to neighbor routers
C. Sets a specific period for routers to neither accept nor advertise a route from a destination where an original route was recently lost
D. Sets a duration where routes are not accepted from the neighbor router that caused a routing loop
Answer: C
2. OSPF is defined on a Frame Relay interface providing point-to-multipoint connections. The remote neighbors can reach this central site, but are complaining of routing failures between each of the remote sites. The central router has all the routes for each remote site. Based on this information, what can be diagnosed as the biggest potential problem?
A. An over-subscribed Frame Relay switch will cause some packet loss.
B. There are problems in the use of OSPF Authentication.
C. There is an incorrect selection of the Designated Router.
D. There is an incorrect DLCI assigned on a point-to-point sub-interface.
Answer: C
3. What kind of packet is being decoded, using the captured debug mpls l2transport packet data command, below?
A. HDLC
B. PPP
C. Ethernet
D. RFC 2427/RFC1490
Answer: D
4. Which do NOT exist?
A. Per VLAN Spanning Tree (PVST).
B. Per VLAN Spanning Tree Plus (PVST+).
C. Per VLAN Spanning Tree Plus Plus (PVST++).
D. Rapid STP (RSTP).
E. Resilient STP (RSTP).
Answer: CE
5. Click the Exhibit button. PE1 and PE2 are connected to the MPLS cloud. All MPLS labels from PE1 and PE2 are working. Observing the shown topology, will this scenario work?
A. This scenario will not work because Gigabit Ethernet can’t be connected to FastEthernet over MPLS.
B. This scenario will work because the issues concerning Gigabit and FastEthernet over MPLS with default behavior should not make any difference.
C. This scenario will not work because Gigabit usually has MTU over 9000 and FastEthernet 1500.
D. This scenario will not work because one side has dot1q header and another side is in port mode.
E. This scenario will work by configuring PWE Class using the Interworking feature. By default, the MTU on each side is 1500, so this is an acceptable solution.
Answer: E
6. What Q.931 message cannot be received in response to sending a Q.931 SETUP message?
A. Alerting
B. Call Proceeding
C. Connect
D. USER Information
E. Progress
Answer: D
7. Which commands are valid in ethernet or ethernet VLAN attachment circuits?
A. match cos
B. match ethernet cos
C. match source-mac
D. match vlan
E. match ethernet multicast
Answer: AD
8. EIGRP applies the principle of Feasible Successor (FS) in resolving a new path to a lost route. What statement regarding the FS is correct?
A. Information is stored for the FS as part of the Link-State Routing updates forwarded for EIGRP.
B. EIGRP estimates the FS from each neighbor for each network after an exchange of database information during the normal update process. It uses this information for path selection when a route is lost.
C. When EIGRP is notified that a route is lost, it will always send requests to each neighbor for ways to reach the lost route. The neighbor that returns the best path will qualify as the FS.
D. EIGRP nominates a central router as the FS for all lost routes during configuration.
Answer: B
No related posts.
Related posts brought to you by Yet Another Related Posts Plugin.